The written design engagement sets a 30-calendar-day interactive design period with regular client participation. Not every day requires a meeting. There is no hidden revision-count cap and no automatic approval at the end of the period.
Participate at useful decision points
Agree the kickoff, concept reviews, design development and final review in the engagement. Comments and decisions stay attached to the version discussed.
Unlimited design revisions
Revisions are not rationed by a counter. Unresolved work at the end of the design period remains visible for an explicit next-step agreement; it does not become automatically approved, purchased or built.
Dependencies stay visible
Client decisions, site access, permits, specialist review, vendor information and lead times can affect progress. The design period is not a promise that construction, cycling or biological readiness will finish in 30 days.
Three distinct approvals
A design approval names the exact version. Purchasing and construction each require separate written approval of their current scope. Changes to approved cost or schedule need a new written decision.
From inquiry to ongoing care
Project fit
Contact, ZIP, type, available size, budget and timing. An inquiry does not reserve capacity.
Site and feasibility
Private site information, access, utilities, property authority, care capacity and required qualified professionals.
Written design engagement
Agree the design scope, 30-calendar-day start and end dates, client participants and scheduled review points.
Interactive design
Regular client inclusion and unlimited design revisions. Keep versioned drawings, comments, alternatives and decisions.
Exact design approval
Approve an identified version with scope, dimensions, equipment, drawings, compatibility review, estimate, care plan and schedule assumptions.
Purchasing approval
Separate explicit authority for the current purchasing scope and cost. Design approval alone does not authorize ordering.
Construction approval and milestones
Separate explicit authority; record vendors, lead times, access, permits, milestones and written changes to cost or schedule.
Technical commissioning
Document equipment, leak/operation checks, utilities, controls, safety and qualified sign-offs appropriate to the project.
Biological readiness and staged stocking
Record measured readiness and an approved staged stocking plan; a calendar date alone never establishes biological readiness.
Handoff and ongoing care
Deliver current records, equipment details, care responsibilities, training, follow-up and an agreed maintenance scope.
Start the short project inquiry
Project acceptance, the written engagement and any purchasing or construction authority are confirmed separately.